Ground investigation works Case Study

Working in partnership with Middlesbrough Council we carried out a Ground Investigation for a highway crossing over the A689 in Wynyard.

The intrusive investigation included trial pits and cable percussive boreholes to characterise the underlying deposits for future foundation design.

Northpoint worked alongside structural and civil design engineers to provide a cost-effective foundation solution. A pile foundation solution was adopted due to the bridge loading conditions and variable geology.

We offer geotechnical design support for a range of highway and infrastructure project throughout the UK. If you require any assistance please do not hesitate to contact one of the team.