Working Platform Design for Bridge Replacement at Scottish Water Penwhapple Reservoir
CAT 2 platform and access road designs enabling safe crane operation for an innovative over-water bridge installation in South Ayrshire.
PROJECT OVERVIEW
Delivering Safe Temporary Works for a Complex Bridge Replacement
Northpoint Geotechnical was appointed to design and oversee the temporary works required for the replacement of a degraded valve tower bridge at Scottish Water’s Penwhapple Reservoir, South Ayrshire.
The project, led by Beaver Bridges, featured the installation of a Fibre Reinforced Polymer (FRP) bridge using an innovative over-water jacking system from a pontoon - requiring robust ground engineering solutions to ensure safety, stability, and efficiency in challenging weather conditions.
CLIENT REQUIREMENTS & CHALLENGES
Addressing Complex Site and Environmental Constraints
Unpredictable Scottish weather during a critical installation window
Requirement for safe access and crane stability over varied ground conditions
Compliance with Eurocode standards and adherence to CAT 2 design verification procedures
Minimising environmental impact while operating in a sensitive reservoir environment
OUR APPROACH & METHODOLOGY
From Ground Investigation to Certified Platform
Ground Investigation - Dynamic Sampling boreholes and Dynamic Probe testing along the proposed trackway and crane pad locations.
Ground Modelling - Development of a detailed geotechnical model to inform design parameters.
Design - CAT 2 verified working platform design for a granular crane pad and CAT 2 design checks for aluminium trackway access road.
On-Site Guidance - Liaison with the platform contractor, George Leslie, during installation to ensure design compliance.
Certification - Issued the Working Platform Certificate (WPC) following completion, along with a Geotechnical Design Report (GDR) in line with Eurocode standards.
RESULTS & DELIVERABLES
Safe, Compliant, and Efficient Project Delivery
Stable crane operation enabling safe over-water bridge installation
Access trackway designed to support construction traffic without ground failure
Comprehensive GDR and WPC documentation ensuring full transparency and regulatory compliance
Installation completed on time despite challenging weather conditions
NEXT STEPS
Need Expert Temporary Works or Working Platform Design?
Northpoint delivers working platform and temporary works solutions across the UK, including access roads, crane pads, and pile mats. If your project demands precision, compliance, and safety, we can help.
Email: info@northpointgeotechnical.com | Tel: 0191 917 2310